Dual Skimmer swimming pools finished with PVC Liner overlooking the Red Sea at The Groove Ain Sokhna
Liner Installation · Ain SokhnaSpecialized coastal-grade Liner supply, thermal seam welding, and watertight sealing for both the large primary Skimmer pool and secondary pool at The Groove Ain Sokhna.

Coastal PVC Liner Installation for Two Sea-View Pools – The Groove, Ain Sokhna

Executed at The Groove Resort in Ain Sokhna along the Red Sea coast, our scope covered specialized Liner supply and precision installation for a large primary swimming pool alongside a smaller companion basin overlooking the sea.

Exact Project Scope
Liner Supply & Installation Only
Executed Basins
Large Main Pool + Small Pool
Operating System
Skimmer System
Location & Environment
The Groove · Coastal Ain Sokhna
Architectural Brief

Coastal PVC Liner Craftsmanship Along the Red Sea

Executed at The Groove Resort in Ain Sokhna along the Red Sea coast, our scope covered specialized Liner supply and precision installation for a large primary swimming pool alongside a smaller companion basin overlooking the sea.

Dedicated strictly to the Liner system finish, the work utilized marine-grade UV-stabilized membranes engineered for high coastal humidity, watertight perimeter sealing, and seamless compatibility with each pool’s Skimmer circulation.

Signature Engineering Highlights
Specialized PVC Liner Craftsmanship
UV & Coastal Salinity Resistance
Seamless Thermal Seam Welding
Watertight Skimmer System Integration
Dual Seafront Resort Basins
Built for Ain Sokhna Humidity
Large main Skimmer pool finished with smooth turquoise Liner facing beachfront pergola at The Groove Ain Sokhna
Primary Liner Basin
Smaller companion pool showcasing neat corner detailing and thermal-welded PVC Liner at The Groove
Dual Skimmer swimming pools finished with PVC Liner overlooking the Red Sea at The Groove Ain Sokhna
Engineering Chapters

Coastal Liner Installation Standards & Craftsmanship

Select any engineering discipline to inspect its technical deliverables paired with site photography.

Dual Skimmer swimming pools finished with PVC Liner overlooking the Red Sea at The Groove Ain Sokhna
01 · UV & Salinity-Resistant Coastal Liner Materials

Marine-grade PVC Liner membranes selected specifically for direct Red Sea UV exposure, high ambient humidity, and effortless hygiene.

Architectural Photo Archive · 3 Verified Frames

Executed Liner Works at The Groove – Ain Sokhna

Dual Skimmer swimming pools finished with PVC Liner overlooking the Red Sea at The Groove Ain Sokhna
01 · Dual Pools Sea Vista

Panoramic seafront view showcasing both the large primary pool and companion pool completed with precision PVC Liner finishes.

Large main Skimmer pool finished with smooth turquoise Liner facing beachfront pergola at The Groove Ain Sokhna
02 · Primary Liner Basin

Crisp wall edges and wrinkle-free turquoise Liner craftsmanship inside the primary beachfront Skimmer basin.

Smaller companion pool showcasing neat corner detailing and thermal-welded PVC Liner at The Groove
03 · Companion Liner Basin

Companion pool highlighting clean internal corner folding, tight perimeter anchoring, and seamless stone coping.

Engineering Integration

Executed Liner Installation Deliverables

Aligned strictly with our executed contract scope, below are the exact Liner installation stages completed across both pools at The Groove:

Structural substrate inspection, surface cleaning, and preparation across both large and small basins
Supply of coastal-grade, UV-resistant reinforced PVC Liner membranes
Perimeter track anchoring and calibrated membrane tensioning without surface wrinkles
Precision hot-air seam welding and neat internal corner & step detailing
Watertight compression sealing around all Skimmer throats, return jets, and lighting fixtures
Hydrostatic watertight containment check and final resort quality handover
Operational Reliability

Performance Advantages of the Executed Liner Finish

  • Added elastomeric waterproofing layer shielding the concrete basin in coastal terrain
  • Smooth, grout-free wall and floor contact minimizing algae buildup and skin abrasions
  • Vibrant, uniform turquoise water tone matched cleanly between both beachfront pools
  • Rapid, clean installation footprint with straightforward daily Skimmer upkeep